Qualcomm Building N
San Diego, California

FAA NFDC Information Effective 56-day cycle 10/15/2015 - 12/10/2015

Ops Comms Services Owner Runways IFR Procs Current NOTAMs Remarks


FAA Identifier:2CN7
Lat/Lng: 32.8956944444, -117.196083333
32-53-44.5000N, 117-11-45.9000W
Estimated by OWNER on 05/09/2007
Elevation: 486 feet Estimated on 05/09/2007 Rooftop.
Magnetic Variation: [12E (2015)]
Sectional: LOS ANGELES
From City: 11nm N of San Diego


Use: Private
Airspace Analysis: CONDITIONAL
Provided Pvt Use by Qualcomm only; VFR Operations; Obstr-Free Ingress & Egress Routes.
Ownership: Privately owned
Activation: 11/2007
Attended: Continuous
Control Tower: no
ARTCC: Los Angeles Center (ZLA)
FSS: San Diego FSS (SAN)
Wind Indicator: Lighted
Lights: Activate Perimeter Lights - 123.05.
Landing Fee: no



Based Aircraft

Total: 0

Annual Operations

Total: 0


Owner: Qualcomm
5775 Morehouse Dr
San Diego, Ca 92121
Manager: Ken Dumont, Facilities Engineer II
5775 Morehouse Dr
San Diego, Ca 92121


Runways: H1

Runway H1

Length: 48 feet
by Owner on 05/09/2007
Width: 48 feet
Surface: Pierced Steel Planking / Landing Mats / Membranes
Runway Lights Edge Intensity: Perimeter



Additional Remarks

This information is current as of the date at the top of the page. These pages are valid for all US airports, based on information from FAA National Flight Data Center. Weather information is provided based on AvnWx Data Sources. NOTAM information is from FAA's NAIMES data portal.

As with most information on this website, this page is generated based on FAA data, with automatic translations done via computer. You can also directly read the A/FD via the green icon link at the top of the page, which is the FAA text, and sometimes provides a different translation of codes. Please email me (using link at top-right of this page) if you see information which is confusing, misleading, or wrong....Or have suggestions for additions/changes.

Comments from the user community are clearly noted as such this page, are for informational purposes only, may be wrong and/or out-of-date, and must not be used as a sole source for critical decision making. See Privacy Policy and Conditions of Use.